Project Details

2023-2025 Capital Expenditure - Project Details
SKAGIT VALLEY - 040
ctcLink Last Run: Jul 2 2025 5:02AM

DetailsFundAppropProjectOFM Proj.DescriptionAllocationsExpenses
Click to Open
057 C12 Q133 40000110 Library/Culinary Arts Bldg Design (BI2325 reapprop) 1,313,158.00 1,313,157.60
Click to Open
057 C27 Q622 40000431 (Asset 4903) Replace a Emergency Access Road located on the Skagit Valley College Main Campus (040A). This component has exceeded its useful life and is the most likely to fail and disrupt campus operations. The Emergency Access Road location and other details are fully described in the agency's 2019 Infrastructure Survey.; -$89K 3/9/23 moving to new project Q766 (Bal = $530,000), -$75K 3/9/23 moving to new project Q767 (Bal = $455,000) (Reapprop est. 2021-23); -$25,271.71 4/24/25 moved to R916 (Bal. = $0) 0.00 0.00
Click to Open
057 C27 Q766 40000431 Repair the failed fire lane between Oak Hall and the Central Plaza at Whidbey Campus. (Whidbey Campus (040C); Oak Hall (040-16) - UFI A03072) (Reapprop est. 2021-23); +$19,173.77 9/18/23 moved from Q767 (Bal = $52,586.54) 52,586.54 52,586.54
Click to Open
057 C27 Q767 40000431 Replace the failing retention pond located on the Skagiot valley College Main Campus. This component has reached its useful life and is most likely to fail and disrupt campus operations. (Main Campus (040A); Nelson Hall (040-82) - UFI A07932) (Reapprop est. 2021-23); -$19,173.77 9/18/23 moved to Q766 (Bal = $0) 0.00 0.00
Click to Open
057 C27 R916 40000431 Install a utility submeter at the exterior of the Gary Knudzen Cardinal Center building. This submeter would be used to calculate building energy use required for Clean Building Standard compliance reporting and active energy management. (Main Campus (040A); Gary Knutzen Cardinal Center (040-30) - UFI A09143) 25,271.71 25,191.36
Click to Open
057 D07 R020 40000595 Multiple Buildings (040A) - Replace the master clock and intercom system components that are physically integrated into campus facilities (built-in) and are not considered to be wireless or remote components. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F13); -$208K 8/19/2024 moved to R026 (Bal = $0) 0.00 0.00
Click to Open
057 D07 R021 40000595 Ford Hall (040-54; UFI A05075) - Replace the failing main electrical disconnect switch. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F11).; -$24K 3/17/25 moved to R889 (Bal. = $29,000); -$29K 5/28/25 moved to R889 (Bal. = 0) 0.00 0.00
Click to Open
057 D07 R022 40000595 Sprague Hall (040-15; UFI A01220) - Replace four obsolete univent heaters and exhaust fans. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F07); +$213K 8/19/2024 moved from other projects (Bal = $409,000); -$4K 5/28/25 moved to R889 (Bal. = $405,000) 405,000.00 407,570.18
Click to Open
057 D07 R023 40000595 Whidbey Old Main (040-11; UFI A06127) - Replace the obsolete and failing boiler, circulation pump, expansion tank and valves. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F01).; -$4K 5/28/25 moved to R889 (Bal. = $380,000) 380,000.00 379,999.50
Click to Open
057 D07 R024 40000595 San Juan Center (040-89; UFI A04979) - Replace the obsolete HVAC units and the failed control system. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F10); -$51K 8/19/2024 moved to other projects (Bal = $210,000); -$109K 3/17/25 moved to R889 (Bal. = $101,000); -$10K 5/28/25 moved to R889 (Bal. = $91,000) 91,000.00 86,415.84
Click to Open
057 D07 R025 40000595 Whidbey Old Main (040-11; UFI A06127) - Replace the failing windows and water-damaged trim. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F03);+$23K 8/19/2024 moved from other projects (Bal = $424,000); -$4K 3/17/25 moved to R889 (Bal. = $420,000) 420,000.00 420,000.00
Click to Open
057 D07 R026 40000595 Ford Hall (040-54; UFI A05075) - Replace ten obsolete HVAC units. Salvageable parts should be retained to help maintain the remainging units. . This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F12); +$208K 8/19/2024 moved from R020 (Bal = $744,000) 744,000.00 737,157.19
Click to Open
057 D07 R027 40000595 Oak Hall (040-16; UFI A03072) - Replace the failing central water heater and deteriorated sections of pipe. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F05); +$63K 8/19/2024 moved from other projects (Bal = $139,000); -$3K 3/17/25 moved to R889 (Bal. = $136,000) 136,000.00 122,854.34
Click to Open
057 D07 R028 40000595 Multiple Buildings (040C) - Replace the master clock and intercom system components that are physically integrated into campus facilities (built-in) and are not considered to be wireless or remote components. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F16); -$190K 8/19/2024 moved to other projects (Bal = $0) 0.00 0.00
Click to Open
057 D07 R029 40000595 Whidbey Old Main (040-11; UFI A06127) - Replace the failing radiant heaters. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F02).; -$60K 3/17/25 moved to R889 (Bal. = $494,000) 494,000.00 486,607.53
Click to Open
057 D07 R030 40000595 Whidbey Child Care Center (040-19; UFI A03782) - Replace the failing heater and air conditioning unit serving the lower floor of the building. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency F06); -$58K 8/19/2024 moved to other projects (Bal = $0) 0.00 0.00
Click to Open
057 D07 R889 40000595 Facility:replacement of the failing Andover DDC system that serves the Nelson Hall building(Main Campus (040A); Nelson Hall (040-82) - UFI A07932); +$47K 5/28/25 moved from R021, R022, R023, & R024 (Bal. =$247,000) 247,000.00 220,513.30
Click to Open
057 D09 R227 40000630 Skagit Valley College URF 605,000.00 577,054.79
Click to Open
057 D13 R284 40000698 Site (040A) - Repair the utility tunnel envelope to stop water infiltration and to ensure that it remains structurally sound. Replace the corroded steam pipe supports, obsolete steam fittings. . This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency S03). 1,380,000.00 878,716.95
Click to Open
057 D13 R285 40000698 Site (040A) - Replace the failing steam and condensate pipe expansion joints. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency S04) 153,000.00 152,999.13
Click to Open
057 D15 R325 40000721 (asset 4949) Replace a Retention pond located on the Skagit Valley College Main Campus (040A). This component has exceeded its useful life and is the most likely to fail and disrupt campus operations. The Retention pond location and other details are fully described in the agency's 2019 Infrastructure Survey. 30,000.00 29,999.99
Click to Open
057 D15 R326 40000721 (assets 4948, 4950, 4951 & 4952) Replace multiple Swales located on the Skagit Valley College Main Campus (040A). These components have exceeded their useful life and are the most likely to fail and disrupt campus operations. The Swale locations and other details are fully described in the agency's 2019 Infrastructure Survey.; +$62K 2/26/2025 moved from R328 (Bal. = $108,000) 108,000.00 107,923.80
Click to Open
057 D15 R327 40000721 (asset 4927) Replace a Storm Line located on the Skagit Valley College Main Campus (040A). This component has exceeded its useful life and is the most likely to fail and disrupt campus operations. The Storm Line location and other details are fully described in the agency's 2019 Infrastructure Survey. 97,000.00 96,999.59
Click to Open
057 D15 R328 40000721 (assets 4796, 4801, 4803, 4822 & 4824) Replace multiple Sewer Lines located on the Skagit Valley College Main Campus (040A). These components have exceeded their useful life and are the most likely to fail and disrupt campus operations. The Sewer Line locations and other details are fully described in the agency's 2019 Infrastructure Survey. -$62K 2/26/2025 moved to R326 (Bal. = $1,865,000); -$70K 4/24/25 moved to R914 (Bal. = $1,795,000) 1,795,000.00 1,792,981.48
Click to Open
057 D15 R914 40000721 Installation of utility sub meters on the outside of the Gary Knudzen Cardinal Center building. These submeters are needed for compliance requirements for the Clean Building Standard. (Main Campus (040A); Gary Knutzen 70,000.00 40,000.00
Click to Open
057 D17 R455 40000754 Program - Multiple space renovations and remodel (057) 545,820.00 542,951.41
Click to Open
057 D17 R456 40000754 Program - Fire Station Tech Program - Phase 2 713,000.00 712,999.98
Click to Open
057 D20 R631 92000037 Career Launch Equipment #26434 Automotive Technology 300,741.00 300,740.61
Click to Open
057 D20 R717 92000037 Career Prep and Launch equipment 26653 Manufacturing / Engineering Tech 170,072.00 163,156.42
Click to Open
057 D20 R718 92000037 Career Prep and Launch equipment 26669 Diesel Power Tech 135,750.00 135,750.00
Click to Open
060 D10 R267 40000670 Sprague Hall (040-15; UFI A01220) - Recondition the degraded roofing surface to extend its useful life. Repair water damage due to condensation forming on the bottom of roof panels. Install proper roof insulation to stop water damage from occurring due to condensaion. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency R02); -$101K 8/19/2024 moved to R768 (Bal = $166,000); -$10K 4/24/25 moved to R768 (Bal. = $156,000) 156,000.00 155,244.48
Click to Open
060 D10 R268 40000670 Fire Station (040-81; UFI A03657) - Replace the failing roofing. This deficiency is fully described in the 2021 Skagit Valley College Facility Condition Survey (Deficiency R04); -$60K 8/16/24 moved to R768 (Bal = $61,000); -$4K 4/24/25 moved to R268 (Bal. = $57,000) 57,000.00 54,785.64
Click to Open
060 D10 R768 40000670 Repair the leaking roof and skylight. (Whidbey Campus (040C); Whidbey Hayes Hall (040-18) - UFI A09219); +$14K 4/24/25 moved from R267 & R268 (Bal. = $175,000) 175,000.00 156,718.35
Click to Open
060 D16 R454 40000754 Program - Multiple space renovations and remodel (060); -305,885 10/26/23 moved to R588 (Bal = $0) 0.00 0.00
Click to Open
060 D16 R588 40000754 Construct a model fire station for the Fire Protection Technology program to replace the failed and unuseable space currently designated for this program. (Main Campus (040A); Site (040A) 305,885.00 291,789.94
Click to Open
060 D18 R509 40000871 Preventive Facility Maintenance & Building System Repairs (2023-25) 691,000.00 345,500.00
Click to Open
145 R15 R565 Burlington Head Start Play Area; +$1,020,000 8/29/2024 SB Res 24-08-46 (Bal = $1,665,000) 1,665,000.00 0.00
Click to Open
145 R15 R566 Pacific Place Head Start exterior envelope repairs; +$50K 1/11/24 (Balance = $210,000) 210,000.00 0.00
Click to Open
145 R15 R567 Burlington Head Start exterior envelope repairs; +$30K 1/10/24 (Balance = $75,000) 75,000.00 0.00
Click to Open
145 R15 R645 Install EV charging station at San Juan Center 70,500.00 66,919.91
Click to Open
145 R15 R752 Grant funds - install EV charging stations; -64K 3/21/2025 (Bal. = $15,000) 15,000.00 15,000.00
Click to Open
145 R15 R871 Local capital - Sedro Woolley Head Start (UFI #A07323) scoping study and construction cost estimate for a remodel of the center. 30,000.00 0.00
Click to Open
145 R15 R873 Local capital - Fire Training Tower (UFI #A08310) to develop a scope of work and project estimate.; +$7K 6/18/2025 (memo 25-153) (Bal. = $24,000) 24,000.00 23,004.50
Click to Open
145 R15 R925 Local funds - Automotive Technology Program EV Charger Station (UFI#A09398). 37,000.00 0.00
Click to Open
147 R10 M535 Fire Station for Fire Protection Technology program (FM13 reapprop); -$333,616.50 4/11/2025 closed per college request. (Bal. = $0) 0.00 0.00
Click to Open
147 R10 Q584 Old Main building coffee shop and veterans' lounge 327,079.45 0.00
Click to Open
147 R10 Q690 40000110 Local funds - Library / Culinary Arts building SB Res 22-08-41 8/22/2022 3,999,000.00 336,554.48
Click to Open
147 R10 R564 Install bird deterrent netting at Tennis Court Pavilion; +$25K 10/3/2024 (Bal = $165,000) 165,000.00 154,526.95
Click to Open
147 R10 R646 Install sinks and electrical outlets in S-1 and S-3 of Sprague Hall for Nursing Program; +$177K 6/27/2024 (Bal = $277,000) 277,000.00 222,177.13
Click to Open
147 R10 R751 Local funds - Install EV charging stations; -$21,000 3/21/2025 - local project funds not needed to complete the project (Bal = $0) 0.00 0.00
Click to Open
147 R10 R887 Local capital - Reeves Hall (UFI #A05238) install new electrical circuit to support CNC machine. 15,000.00 962.50
Click to Open
23N D08 R874 40000630 SBCTC Hazmat Emergency Pool - Mount Vernon Tunnell - steam condensate pipe abatement and repair.; +$343,102 6/24/2025 (Bal. = $843,102) 843,102.00 843,102.00
Click to Open
26C D19 R761 91000443 HB 1390 decarbonizaation planning; +$5,908 10/18/2024 (Bal = $75,000); +$7,500 1/27/2025 (Bal. = $82,500) 82,500.00 0.00
Click to Open
26C D21 R701 40000878 CBPS - Utility Submeters for CBA (see memo 24-126 for approved meter list) 690,000.00 120,242.45