Allocation Schedule : 2023–25 Biennium

COLUMBIA BASIN - 190

OFM ProjectSBCTC ProjectFundAppropDescriptionApprop ReappropUnallotted ReserveAllocations
N482 147 R10 Relocate dental hygiene program to Wortman Medical (FM13 reapprop) 144,207.37 0.00 144,207.37
-- N483 522 R12 Student Recreation Center COP SB Res 18-06-25 and 2019-21 capital budget request, +$5M 12-2-2020 SB Res 20-12-51 (estimated COP bal) 16,559,377.88 0.00 16,559,377.88
P593 147 R10 Property acquisition 840 Northgate Drive SB Res 21-03-07 (FM13 reapprop) 19,410.12 0.00 19,410.12
Q654 147 R10 Local - Library renovations SB Res 22-05-20 327,449.21 0.00 327,449.21
-- Q705 145 R15 T building Renovations for Equity Center Title V grant (FM13 reapprop); -$482,085.48 1/3/24 moved to R618 (Bal = $120,000) 120,000.00 0.00 120,000.00
Q706 147 R10 T Building Renovations for Equity Center local funds; +$650K 8/30/2023 SB Res 23-08-33 (Bal = $782,364.09) 782,364.09 0.00 782,364.09
40000595 R115 057 D07 Library Building (190-00L; UFI A07081) - Repair and recondition the failing cooling tower circulation loop system and replace the associated failed pipe trap. This deficiency is fully described in the 2021 Columbia Basin College Facility Condition Survey (Deficiency F03). 82,000.00 0.00 82,000.00
40000595 R116 057 D07 Multiple Buildings (190A) - Replace ten obsolete water heaters that have exceeded their expected life. This deficiency is fully described in the 2021 Columbia Basin College Facility Condition Survey (Deficiency F01); -$76,141 11/15/24 moved to R802 (Bal = $54,859) 54,859.00 0.00 54,859.00
40000595 R117 057 D07 Administration Building (190-00A; UFI A09316) - Repair and recondition the failing chiller. This deficiency is fully described in the 2021 Columbia Basin College Facility Condition Survey (Deficiency F02); -$67K 11/15/24 moved to R802 (Bal = $145,000) 145,000.00 0.00 145,000.00
40000630 R210 057 D09 Columbia Basin College URF 896,000.00 0.00 896,000.00
40000670 R274 060 D10 Vocational Tech Building (190-00V; UFI A03475) - Repair and recondition the failed sections of roofing and flashing. This deficiency is fully described in the 2021 Columbia Basin College Facility Condition Survey (Deficiency R01); -$65K 8/19/2024 moved to R275 (Bal = $0) 0.00 0.00 0.00
40000670 R275 060 D10 Multiple Buildings (190B) - Recondition the failing roofing on the three buildings located on the north end of the campus. This deficiency is fully described in the 2021 Columbia Basin College Facility Condition Survey (Deficiency R03); +$65K 8/19/2024 moved from R274 (Bal = $275,000) 275,000.00 0.00 275,000.00
40000698 R314 060 D12 Site (190A) - Replace the failed irrigation control system. Roughly 1/3 of the irrigation system serves athletic fields that have no instructional use. Therefore, the college must fund 1/3 of the project cost with local funds. This deficiency is fully described in the 2021 Columbia Basin College Facility Condition Survey (Deficiency S02). 82,000.00 0.00 82,000.00
40000721 R394 057 D15 (assets 3508, 3510, 3515, 3516, & 3517) Replace multiple Sewer Lines located on the Columbia Basin College Main Campus (190A). These components have exceeded their useful life and are the most likely to fail and disrupt campus operations. The Sewer Line locations and other details are fully described in the agency's 2019 Infrastructure Survey. 1,862,000.00 0.00 1,862,000.00
40000721 R395 057 D15 (assets 3519, 3521 & 3522) Replace multiple Additional Sewer Lines located on the Columbia Basin College Main Campus (190A). These components have exceeded their useful life and are the most likely to fail and disrupt campus operations. The Additional Sewer Line locations and other details are fully described in the agency's 2019 Infrastructure Survey. 714,000.00 0.00 714,000.00
40000721 R396 057 D15 (asset 3565) Replace a Three Phase Transformer located on the Columbia Basin College Main Campus (190A). This component has exceeded its useful life and is the most likely to fail and disrupt campus operations. The Three Phase Transformer location and other details are fully described in the agency's 2019 Infrastructure Survey. 80,000.00 0.00 80,000.00
40000721 R397 057 D15 (asset 3483) Replace a Potable Water Line located on the Columbia Basin College Main Campus (190A). This component has exceeded its useful life and is the most likely to fail and disrupt campus operations. The Potable Water Line location and other details are fully described in the agency's 2019 Infrastructure Survey. 538,000.00 0.00 538,000.00
40000754 R481 057 D17 Program - Lee R Thornton Ctr (190-00T) Minor renovation for Career Services Relocation; -$544,998 2/16/24 moved to R482 (Bal = $0) 0.00 0.00 0.00
40000754 R482 057 D17 Program - T-Building Science Wing Renovation; +$544,998 2/16/24 moved from R481 (Bal = $1,564,705) 1,564,705.00 0.00 1,564,705.00
40000871 R524 060 D18 Preventive Facility Maintenance & Building System Repairs (2023-25) 798,000.00 0.00 798,000.00
-- R569 147 R10 President Office remodel 150,000.00 0.00 150,000.00
-- R579 147 R10 Replace outdated readerboard and additional wayfinding 450,000.00 0.00 450,000.00
-- R581 147 R10 Resurface North HUB parking lot; +$850K 2/1/2024 SB Res 24-02-84 (Bal = $1,400,000) 1,400,000.00 0.00 1,400,000.00
40000630 R592 23N D08 SBCTC Hazmat Emergency Pool - Bldg T mold and VOC abatement and repair, +$7,531 12/20/2023 (bal = $120,031) 120,031.00 0.00 120,031.00
-- R593 147 R10 Local funding - crack seal and stripe roads and parking lots; +125K 6/16/2025 (Bal. = $225,000) 225,000.00 0.00 225,000.00
-- R618 147 R10 future grant portion of T bldg renovations for Equity Center Title V 482,085.48 0.00 482,085.48
92000037 R627 057 D20 Career Launch Equipment #26429 Industrial Maintenance Tech 82,985.00 0.00 82,985.00
-- R663 147 R10 Property acquisition, architect and design for new student services housing SB Res 24-03-11; +$ 4M 10/31/2024 SB Res 24-10-61 (Bal = $10,000,000) 10,000,000.00 0.00 10,000,000.00
-- R664 147 R10 Science program lab and mechanical equipment upgrades SB Res 24-03-12, +$600K 6/27/2024 SB Res 24-06-33 (Bal = $2,100,000); -$250K 4/7/2025 (Bal. = $1,850,000_ 1,850,000.00 0.00 1,850,000.00
40000878 R686 26C D21 CBPS - Utility Submeters for CBA (see memo 24-111 for approved meter list) 527,000.00 0.00 527,000.00
-- R730 147 R10 COP - construct new student housing SB Res 24-06-32 18,000,000.00 0.00 18,000,000.00
-- R750 147 R10 Remove 5 turnstile doors in 3 buildings and replace with standard storefront doors. 100,000.00 0.00 100,000.00
40000595 R802 057 D07 Replace Multiple failed HVAC systems (Main Campus (190A); Multiple (190A) ) 143,141.00 0.00 143,141.00
40000880 R829 26C D23 CBPS - RCx, A03600, A09278, A10443, A25158 (see memo 25-62 for details) 235,654.00 0.00 235,654.00
-- R843 147 R10 Wayfinding along Argent Road and in place of Hawk statue 500,000.00 0.00 500,000.00
-- R869 147 R10 Local capital expenditure authority for safety, accessibility, and wayfinding improvements at Saraceno Way. SB Res 25-02-06 2,750,000.00 0.00 2,750,000.00
-- R900 147 R10 Local capital - install isolation valves, sewer pipe, and utility holes 250,000.00 0.00 250,000.00
40000595 R901 147 R10 Local capital - repair and reconditioning for a chiller in the Administration Building (UFI #A09316). 50,000.00 0.00 50,000.00
40000878 R921 147 R10 Local capital - Utility submeters (see also R686) 25,000.00 0.00 25,000.00